Beginning at Bridge Street intersection by Dinomart south: Sidewalks, Retaining Walls and Drainage replacement through June.
Bridge (Going towards Chester) replacement on Route 94 begins Friday June 5th. This is a full road closure. And will require a driver detour. Construction will be through early September.
Route 94 Slope Repair will begin after the Bridge replacement. This will Repair the falling shoulder coming into the village. This will close one lane and require use of temporary traffic signals.
These times are tentative and can change.
Plan accordingly and take into account extra time for traveling.
Please be cautious while driving through the Village and thank you for your patience during this process.